[
https://issues.apache.org/jira/browse/HBASE-11164?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
stack resolved HBASE-11164.
---------------------------
Resolution: Fixed
Hadoop Flags: Reviewed
I just ran the roling upgrade script and it worked. Did on small cluster. No
exceptoins in logs other than expected when RSs go away for a while as they are
rolling graded. Did this after changing symlink to point at new software:
HADOOP_HOME=~/hadoop-2.6.0-CRC-SNAPSHOT ~/hbase/bin/rolling-restart.sh --config
~/conf_hbase
Add more doc into upgrade on what a rolling upgrade is and added some to the
0.98 to 1.0 section.
Resolving as done.
> Document and test rolling updates from 0.98 -> 1.0
> --------------------------------------------------
>
> Key: HBASE-11164
> URL: https://issues.apache.org/jira/browse/HBASE-11164
> Project: HBase
> Issue Type: Sub-task
> Reporter: Enis Soztutar
> Assignee: stack
> Priority: Critical
> Fix For: 0.99.2
>
>
> I think 1.0 should be rolling upgradable from 0.98 unless we break it
> intentionally for a specific reason. Unless there is such an issue, lets
> document that 1.0 and 0.98 should be rolling upgrade compatible.
> We should also test this before the 0.99 release.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)