Hi, For the next RC for 1.0.0, I am waiting for a resolution on HBASE-12728 either way, since if we go down what is proposed we need the changes to be in 1.0.
There are also 2 criticals to be resolved hopefully before the RC: https://issues.apache.org/jira/browse/HBASE-12270?jql=project%20%3D%20HBASE%20AND%20fixVersion%20%3D%201.0.0%20AND%20resolution%20%3D%20Unresolved%20AND%20priority%20%3D%20Critical%20ORDER%20BY%20key%20DESC If we have some resolution for these this week, I plan to cut the RC this Friday, Jan 9th. I think we can at least decide whether to go with the proposal in HBASE-12728 or not sooner. In case we do decide to pursue, I'll cut the RC whenever we have committed the patch. Cheers, Enis
