Phil Yang created HBASE-17112:
---------------------------------

             Summary: Prevent setting timestamp of delta operations being same 
as previous value's
                 Key: HBASE-17112
                 URL: https://issues.apache.org/jira/browse/HBASE-17112
             Project: HBase
          Issue Type: Bug
            Reporter: Phil Yang
            Assignee: Phil Yang


In delta operations, Increment and Append. We will read current value first and 
then write the new whole result into WAL as the type of Put with current 
timestamp. If the previous ts is larger than current ts, we will use the 
previous ts.

If we have two Puts with same TS, we will ignore the Put with lower sequence 
id. It is not friendly with versioning. And for replication we will drop 
sequence id  while writing to peer cluster so in the slave we don't know what 
the order they are being written. If the pushing is disordered, the result will 
be wrong.





--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to