Mike Drob created HBASE-21287:
---------------------------------

             Summary: JVMClusterUtil Master initialization wait time not 
configurable
                 Key: HBASE-21287
                 URL: https://issues.apache.org/jira/browse/HBASE-21287
             Project: HBase
          Issue Type: Task
          Components: test
            Reporter: Mike Drob
            Assignee: Mike Drob


We can configure how long the local cluster threads will wait for master to 
come up and become active, but not how long we allow initialization to take. 
Being able to tune this would improve my test loop on some experiment I am 
running.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to