Duo Zhang created HBASE-26828:
---------------------------------
Summary: Increase the concurrency when running UTs in pre commit
job
Key: HBASE-26828
URL: https://issues.apache.org/jira/browse/HBASE-26828
Project: HBase
Issue Type: Improvement
Components: jenkins, test
Reporter: Duo Zhang
The default forkCount is 0.25C. We used to run on a 16 cores machine so the
concurrency is 4, but now our build nodes are all 8 cores, so the concurrency
is 2. The build time is way more slower than before.
Since we only have 2 slots on the build node, I think it is OK to increase the
forkCount to 0.5C. But I'm not sure whether we should change the default value
in pom, or we just set it in the pre commit job.
--
This message was sent by Atlassian Jira
(v8.20.1#820001)