[
https://issues.apache.org/jira/browse/HBASE-30249?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Duo Zhang resolved HBASE-30249.
-------------------------------
Hadoop Flags: Reviewed
Resolution: Fixed
Pushed to master and branch-3.
Thanks [~liuxiaocs] for reviewing!
> Make TestSyncReplicationStandbyKillMaster stable
> ------------------------------------------------
>
> Key: HBASE-30249
> URL: https://issues.apache.org/jira/browse/HBASE-30249
> Project: HBase
> Issue Type: Sub-task
> Components: Replication, test
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
> Labels: pull-request-available
> Fix For: 3.0.0-beta-2
>
>
> After analyzing, the problem is that, we want to test master switch when
> transiting, but actually, the procedure can be finished within 1 second but
> we will kill mastr after 2 seconds, so we just test nothing, and the master
> killing operation will mess up the code in tearDown and fail the test...
--
This message was sent by Atlassian Jira
(v8.20.10#820010)