[
https://issues.apache.org/jira/browse/HIVE-9026?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14288257#comment-14288257
]
Hive QA commented on HIVE-9026:
-------------------------------
{color:red}Overall{color}: -1 at least one tests failed
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12693957/HIVE-9026.1-spark.patch
{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 7355 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestEncryptedHDFSCliDriver.testCliDriver_encryption_join_with_different_encryption_keys
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_optimize_nullscan
{noformat}
Test results:
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-SPARK-Build/672/testReport
Console output:
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-SPARK-Build/672/console
Test logs:
http://ec2-50-18-27-0.us-west-1.compute.amazonaws.com/logs/PreCommit-HIVE-SPARK-Build-672/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12693957 - PreCommit-HIVE-SPARK-Build
> Re-enable remaining tests after HIVE-8970 [Spark Branch]
> --------------------------------------------------------
>
> Key: HIVE-9026
> URL: https://issues.apache.org/jira/browse/HIVE-9026
> Project: Hive
> Issue Type: Sub-task
> Components: spark-branch
> Affects Versions: spark-branch
> Reporter: Chao
> Assignee: Chao
> Attachments: HIVE-9026.1-spark.patch
>
>
> In HIVE-8970, we disabled several tests which seem to be related to an bug in
> upstream. I filed HIVE-9025 to track it.
> {noformat}
> join38.q
> join_literals.q
> join_nullsafe.q
> subquery_in.q
> ppd_multi_insert.q
> {noformat}
> We need to re-enable these tests after HIVE-9025 is resolved.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)