[ https://issues.apache.org/jira/browse/HIVE-9518?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14307416#comment-14307416 ]
Hive QA commented on HIVE-9518: ------------------------------- {color:red}Overall{color}: -1 at least one tests failed Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12696581/HIVE-9518.3.patch {color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 7488 tests executed *Failed tests:* {noformat} org.apache.hive.jdbc.TestSSL.testSSLFetchHttp {noformat} Test results: http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/2670/testReport Console output: http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/2670/console Test logs: http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-2670/ Messages: {noformat} Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 1 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12696581 - PreCommit-HIVE-TRUNK-Build > Implement MONTHS_BETWEEN aligned with Oracle one > ------------------------------------------------ > > Key: HIVE-9518 > URL: https://issues.apache.org/jira/browse/HIVE-9518 > Project: Hive > Issue Type: Bug > Reporter: Xiaobing Zhou > Assignee: Xiaobing Zhou > Attachments: HIVE-9518.1.patch, HIVE-9518.2.patch, HIVE-9518.3.patch > > > This is used to track work to build Oracle like months_between. Here's > semantics: > MONTHS_BETWEEN returns number of months between dates date1 and date2. If > date1 is later than date2, then the result is positive. If date1 is earlier > than date2, then the result is negative. If date1 and date2 are either the > same days of the month or both last days of months, then the result is always > an integer. Otherwise Oracle Database calculates the fractional portion of > the result based on a 31-day month and considers the difference in time > components date1 and date2. -- This message was sent by Atlassian JIRA (v6.3.4#6332)