Nicholas Brenwald created HIVE-11812: ----------------------------------------
Summary: datediff sometimes returns incorrect results when called with dates Key: HIVE-11812 URL: https://issues.apache.org/jira/browse/HIVE-11812 Project: Hive Issue Type: Bug Components: UDF Affects Versions: 2.0.0 Reporter: Nicholas Brenwald Priority: Minor DATEDIFF returns an incorrect result when one of the arguments is a date type. The Hive Language Manual provides the following signature for datediff: {code} int datediff(string enddate, string startdate) {code} I think datediff should either throw an error (if date types are not supported), or return the correct result. To reproduce, create a table: {code} create table t (c1 string, c2 date); {code} Assuming you have a table x containing some data, populate table t with 1 row: {code} insert into t select '2015-09-15', '2015-09-15' from x limit 1; {code} Then run the following 12 test queries: {code} select datediff(c1, '2015-09-14') from t; select datediff(c1, '2015-09-15') from t; select datediff(c1, '2015-09-16') from t; select datediff('2015-09-14', c1) from t; select datediff('2015-09-15', c1) from t; select datediff('2015-09-16', c1) from t; select datediff(c2, '2015-09-14') from t; select datediff(c2, '2015-09-15') from t; select datediff(c2, '2015-09-16') from t; select datediff('2015-09-14', c2) from t; select datediff('2015-09-15', c2) from t; select datediff('2015-09-16', c2) from t; {code} The below table summarises the result. All results for column c1 (which is a string) are correct, but when using c2 (which is a date), two of the results are incorrect. || Test || Expected Result || Actual Result || Passed / Failed || |datediff(c1, '2015-09-14')| 1 | 1| Passed | |datediff(c1, '2015-09-15')| 0 | 0| Passed | |datediff(c1, '2015-09-16') | -1 | -1| Passed | |datediff('2015-09-14', c1) | -1 | -1| Passed | |datediff('2015-09-15', c1)| 0 | 0| Passed | |datediff('2015-09-16', c1)| 1 | 1| Passed | |datediff(c2, '2015-09-14')| 1 | 0| {color:red}Failed{color} | |datediff(c2, '2015-09-15')| 0 | 0| Passed | |datediff(c2, '2015-09-16') | -1 | -1| Passed | |datediff('2015-09-14', c2) | -1 | 0 | {color:red}Failed{color} | |datediff('2015-09-15', c2)| 0 | 0| Passed | |datediff('2015-09-16', c2)| 1 | 1| Passed | -- This message was sent by Atlassian JIRA (v6.3.4#6332)