Siddharth Seth created HIVE-13520:
-------------------------------------
Summary: Don't allow any test to run for longer than 1 hour in the
ptest setup
Key: HIVE-13520
URL: https://issues.apache.org/jira/browse/HIVE-13520
Project: Hive
Issue Type: Improvement
Reporter: Siddharth Seth
Assignee: Siddharth Seth
Current timeout for batches is 2hours. This needs to be lowered. 1hour may be
too much as well. We can start with this, and reduce timeouts further.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)