Looks like we retain the last 10 runs at max. With tests running in less than an hour, very often, we end up with situations where test reports are not available? I suspect the 10 run limit is due to the size of the logs generated by each run - close to 6GB (on the ptest server). I think it will be useful to increase the number of runs - something like 30 or 50. ptest now has an option which allows log collection for failed tests only. For a test with ~10 failures - the retained log size ended up being 250MB. Does it make sense to turn on this option, and increase the number of retained results? (Anyone know how to change the number of retained runs?) Thoughts?
Thanks, Sid