[
https://issues.apache.org/jira/browse/HIVE-4675?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13707772#comment-13707772
]
Brock Noland commented on HIVE-4675:
------------------------------------
Hi,
Just curious if anyone has started reviewing this yet?
The reason I ask is HIVE-4815 did a lot of refactoring of this code so that
patch by itself is quite large. If no one has started reviewing this then I am
inclined to merge this patch and HIVE-4815 because the total size of the
combined patch is actually smaller than the current patch on this JIRA.
TLDR: If I merge this jira with HIVE-4815 the result is a smaller patch.
Brock
> Create new parallel unit test environment
> -----------------------------------------
>
> Key: HIVE-4675
> URL: https://issues.apache.org/jira/browse/HIVE-4675
> Project: Hive
> Issue Type: Improvement
> Components: Testing Infrastructure
> Reporter: Brock Noland
> Assignee: Brock Noland
> Fix For: 0.12.0
>
> Attachments: HIVE-4675.patch
>
>
> The current ptest tool is great, but it has the following limitations:
> -Requires an NFS filer
> -Unless the NFS filer is dedicated ptests can become IO bound easily
> -Investigating of failures is troublesome because the source directory for
> the failure is not saved
> -Ignoring or isolated tests is not supported
> -No unit tests for the ptest framework exist
> It'd be great to have a ptest tool that addresses this limitations.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira