[ https://issues.apache.org/jira/browse/HIVE-5708?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Brock Noland updated HIVE-5708: ------------------------------- Status: Patch Available (was: Open) > PTest2 should trim long logs when posting to jira > ------------------------------------------------- > > Key: HIVE-5708 > URL: https://issues.apache.org/jira/browse/HIVE-5708 > Project: Hive > Issue Type: Improvement > Reporter: Brock Noland > Assignee: Brock Noland > Priority: Minor > Attachments: HIVE-5708.patch > > > When a build fails we post the build log to JIRA. The issue is that sometimes > this can be a couple hundred KB. Since this log is available in the link also > mentioned in the JIRA we should trim the message size down to say *last* 200 > lines and then add a warning when we need to. -- This message was sent by Atlassian JIRA (v6.1#6144)