I'll respond to the second part - I'm not sure about the first. I think we just need to go through and move JIRAs with a target version of 2.8 to 2.9 (or to backlog if that fits better).
On Wed, Jan 11, 2017 at 7:16 AM, Lars Volker <[email protected]> wrote: > Hi all, > > Do we have an automated way of checking "fix version" fields for > correctness? Out of habit I had put "Impala 2.8.0" there, until I realized > that the 2.8.0-rc had been cut already. I went through my changes, manually > checking whether the fix was included in the rc branch, and set the "fix > version" to "impala 2.9.0" if it wasn't. Do we have tooling to validate and > adjust the "fix version" automatically? > > Similarly I noticed that some issues were created with "target version" = > "Impala 2.8.0", but now their fixes did not make it into 2.8. Is there a > policy what to do with those? > > Thanks, Lars >
