I'll respond to the second part - I'm not sure about the first. I think we
just need to go through and move JIRAs with a target version of 2.8 to 2.9
(or to backlog if that fits better).

On Wed, Jan 11, 2017 at 7:16 AM, Lars Volker <[email protected]> wrote:

> Hi all,
>
> Do we have an automated way of checking "fix version" fields for
> correctness? Out of habit I had put "Impala 2.8.0" there, until I realized
> that the 2.8.0-rc had been cut already. I went through my changes, manually
> checking whether the fix was included in the rc branch, and set the "fix
> version" to "impala 2.9.0" if it wasn't. Do we have tooling to validate and
> adjust the "fix version" automatically?
>
> Similarly I noticed that some issues were created with "target version" =
> "Impala 2.8.0", but now their fixes did not make it into 2.8. Is there a
> policy what to do with those?
>
> Thanks, Lars
>