hi,

after some more tests with the datastore i startet the garbage collector
against a "old" repository where i have  enabled the datastore (it is empty) 
with one existing workspace (OraclePersistenceManager)
as persistence manager and about 190000 files in it 
to find out how long a scan will run ...

i started the gc and after about 4 hours it was finished.
i think this is a very long time. is there a way to make the performacnce 
better ?
i know that all nodes must be read to find out if the binaries in the datastore 
should be delete
but the size of the workspace in production is 5-6 larger than the tested one.

thanks
claus

Reply via email to