Well, 3.1.1 should have been 3.2.0 so lets pretend 3.1.1 is 3.2.0-beta. :-) So if we have to get out a bug-fixing "3.1.2" or anything even quite soon, 3.2.0 is still a reasonable choice.

It is much easier to set the version now. It sets into all sorts of places like written down in JIRA and email.

    Andy

On 08/11/16 13:26, Claude Warren wrote:
Should we wait for the change that causes the version jump first.  I would
think that we would have 3.1.2-SNAPSHOT and then *if* JENA-1250 causes an
incompatible change jump the version to 3.2.0-SNAPSHOT

But I can go either way

+0


On Tue, Nov 8, 2016 at 11:37 AM, Osma Suominen <[email protected]>
wrote:

08.11.2016, 12:33, Andy Seaborne wrote:

Should the next version be 3.2.0?

The Lucene file format may well change.

If we want that, I'll go and update the POM versions.


+1 for calling it 3.2.0.

Yes, the Lucene upgrade (JENA-1250) will very likely go into the next
release in some form and change the Lucene index on-disk format.

-Osma


--
Osma Suominen
D.Sc. (Tech), Information Systems Specialist
National Library of Finland
P.O. Box 26 (Kaikukatu 4)
00014 HELSINGIN YLIOPISTO
Tel. +358 50 3199529
[email protected]
http://www.nationallibrary.fi




Reply via email to