www.beatsoo.org - free application performance monitoring from world wide
locations.

On May 18, 2015 10:56 PM, "Vladimir Sitnikov" <[email protected]>
wrote:
>
> > The scheduler use absolute times and doesn't serve
> well this need.
>
> Clear "start time" and "end time" fields (make them empty)
> Put the required test duration into "duration" field (in seconds as
> the label suggests) of a thread group.
> That is it.

Good point.
>
> >I can't imagine building complex scenarios without the thread groups
coming
> >from the jmeter plugins project.
>
> Please go ahead and tell us which requirements force you to use thread
> groups from jmeter-plugins.
> We (at my company) do have complex tests, complex loads, etc, yet we
> use out-of-the-box thread groups.
>

Actually only the one mentioned above which is obsolete.

I was using the ramp down feature for quite some time but I don't anymore.
So no other points from me.

> Vladimir

Reply via email to