Hi All, I'd like to start the discussion on scheduling in Apache Karaf 2.3.2 and 3.0.0.RC2 builds in the coming weeks.
Apache Karaf 2.3.2 has some important fixes that the community need to have made available. There are currently 25 issues on Jira that need triage, and possible move out to 2.3.3 for fixing. Apache Karaf 3.0.0 has recently been refocused to OSGi spec rev 5, as such another RC cut should be made available to allow wider testing of this change. Given that every run up to an RC tends to uncover the need for a particular critical bug fix or access to an unreleased dependency I think that looking for a 2 to 3 week schedule should be sufficient. What does everyone think? Cheers, Jamie