Conference theme: Apache Linkis(incubating) bi-weekly meeting
Meeting time: 2022/11/23 19:30-21:00(Beijing time)
Tencent Conference: https://meeting.tencent.com/dm/cE6SdQIoSDEJ
Conference number: 396-220-298
Moderator: Xia Chen

Topic:
1. [Fixed Topic] Apache Linkis Incubation & Version Progress Synchronization
Single test task collection
https://github.com/apache/incubator-linkis/issues/2985
2. [Fixed topic] Apache Linkis 1.3.1 progress synchronization. ——Zhu
Hui/Li Meng/Tao Zhiqiang
   Synchronization of seatunnel and trino engine progress: enter the
community environment deployment stage and cooperate with the test
   Verification of availability of multiple data sources (oracle,
kingbase, postgresql, sqlserver, db2, greenplum, dm)    Li Meng
  trino engine documentation
  Engine Material Management Design Document Yang Yun Supplement
  Seatunnel environment deployment support   Meng
  seatunnel documentation Meng
  Basic data management known problem fixes  Zhiqiang
  Basic Data Management Documentation & Api Interface  Zhiqiang
  Data source enhancement Add self-test for oracle, kingbase,
postgresql, sqlserver, db2, greenplum, dm data support (mainly several
metadata query interface verification interface has been provided) ]
Meng
  Data Source Enhancement Add documentation for oracle, kingbase,
postgresql, sqlserver, db2, greenplum, dm data support      Meng
  release-note preparation Ding Qi
  Authorization Verification of the Publishing Process Brother Ding Qi
Follows Up

3. [Fixed topic] Apache Linkis 1.3.2 progress. —— Xi Shihao/Li Meng
   1. 1.3.2 Progress    Xi Shihao
  Spark submit once is merged into the existing spark plugin and the
development progress is 60%
  Spark has completed the ETL through JSON, (the data source is
configured through the URL to be adapted)
  UDF loaded according to ID completed
   2. Linkis thrift protocol implementation development progress 20%    Li Meng
   3. Engine parameter management, the first version has been
developed and needs further modification    Tao Zhiqiang

4. [Fixed topic] The progress of Apache Linkis community operation is
synchronized. —— Li Wen
5. [Fixed topic] The host of the next regular meeting, welcome to claim.
7. [Temporary topic] The progress of the official website
reconstruction is synchronized —— JinFu
 Introduced Netlify to provide direct preview of pull requests for the
official website Completed
 About collaboration roles Currently, some classmate permissions have
been added, and some have been added
 LKIP-24 Linkis official website document reconstruction
https://docs.qq.com/doc/DVUdVUHVxbEtXTUxa
 List of completed documents:
 To-do list:


议题:
1. 【固定议题】Apache Linkis 孵化&版本 进展同步
单测任务集合https://github.com/apache/incubator-linkis/issues/2985
2. 【固定议题】Apache Linkis 1.3.1 进展同步。 —— 朱辉/李孟/陶志强
   1. seatunnel 、trino引擎进展同步:进入社区环境部署阶段,配合测试
   2. 多数据源(oracle,kingbase,postgresql,sqlserver,db2,greenplum,dm)可用性的验证 李孟
  trino 引擎使用文档
  引擎物料管理设计文档 杨云补充中
  seatunnel 环境部署支持 孟兄
  seatunnel 使用文档  孟兄
  基础数据管理已知问题修复  志强兄
  基础数据管理使用文档&Api接口   志强兄
  数据源增强 增加对oracle,kingbase,postgresql,sqlserver,db2,greenplum,dm
数据支持的自测(主要是几个元数据查询接口验证 接口已提供) 孟兄
  数据源增强 增加对 oracle,kingbase,postgresql,sqlserver,db2,greenplum,dm
数据支持的使用文档    孟兄
  release-note准备 定琦
  发布流程的权限验证 定琦兄跟进

3. 【固定议题】Apache Linkis 1.3.2 进展。 —— 郗世豪/李孟
   1. 1.3.2进展 郗世豪
  sparksubmit once 合并到现有 spark 插件中 开发进度60%
  spark通过 json 进行 etl 已完成,(数据源通过URL进行配置待适配)
  udf 按照 id 加载 已完成
   2. Linkis thrift协议实现 开发进度 20% 李孟
   3. 引擎参数管理,初版已开发完毕,还需要进一步修改    陶志强

4. 【固定议题】Apache Linkis 社区运营 进展同步。 —— 李文
5. 【固定议题】下一场例会的主持人,欢迎认领。
7. 【临时议题】官网重构进展同步 —— 金福
 已引入 Netlify 为官网 提供拉取请求的直接预览功能  已完成
 关于协作角色 目前有添加了部分同学权限  已添加部分
 LKIP-24 Linkis官网文档重构  https://docs.qq.com/doc/DVUdVUHVxbEtXTUxa
 已完成的文档列表:
 待完成的列表:


Best Regards!

Chen Xia.

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscr...@linkis.apache.org
For additional commands, e-mail: dev-h...@linkis.apache.org

Reply via email to