Can you run the code below on a machine with CFMX 6.0 Updater 3 and then
the same code in CFMX 6.1 and compare the differences in the output?


<cfset date = createDate(2003, 1, 28)>

<cfloop from="0" to="15" index="i">
        <cfset date = dateAdd("d", i, date)>
        <cfoutput>#dateDiff("d", createDate(1899, 12, 30),
date)#<br></cfoutput>
</cfloop>


I get different results (it drifts after about 2/3 of the way through).

Was there a change in the way 6.1 handles date/times, perhaps due to a
Java update?


-- 
Aidan Whitehall <mailto:[EMAIL PROTECTED]>
Macromedia ColdFusion Developer
Fairbanks Environmental Ltd  +44 (0)1695 51775
Queen's Awards Winner 2003 <http://www.fairbanks.co.uk/go/awards>

________________________________________________________________________
This e-mail has been scanned for all viruses by Star Internet. The
service is powered by MessageLabs. For more information on a proactive
anti-virus service working around the clock, around the globe, visit:
http://www.star.net.uk
________________________________________________________________________

--
** Archive: http://www.mail-archive.com/dev%40lists.cfdeveloper.co.uk/

To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]
For human help, e-mail: [EMAIL PROTECTED]

Reply via email to