[ 
https://issues.apache.org/jira/browse/SOLR-10023?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15852968#comment-15852968
 ] 

Mark Miller commented on SOLR-10023:
------------------------------------

Right, an external script can make each run truly independent. It also allows 
for custom management of results and logs.

ant beast has to make trade offs to live within the build system like it does. 

> Improve single unit test run time with ant.
> -------------------------------------------
>
>                 Key: SOLR-10023
>                 URL: https://issues.apache.org/jira/browse/SOLR-10023
>             Project: Solr
>          Issue Type: Improvement
>      Security Level: Public(Default Security Level. Issues are Public) 
>          Components: Tests
>            Reporter: Mark Miller
>            Assignee: Steve Rowe
>             Fix For: 6.5, master (7.0)
>
>         Attachments: SOLR-10023-add-test-nocompile-target.patch, 
> SOLR-10023-add-test-only-target.patch, SOLR-10023-add-test-only-target.patch, 
> stdout.tar.gz
>
>
> It seems to take 2 minutes and 45 seconds to run a single test with the 
> latest build design and the test itself is only 4 seconds. I've noticed this 
> for a long time, and it seems because ant is running through a billion 
> targets first. 
> I haven't checked yet, so maybe it's a Solr specific issue? I'll check with 
> Lucene and move this issue if necessary.
> There is hopefully something we can do to improve this though. At least we 
> should try and get some sharp minds to take first / second look. If I did not 
> use an IDE so much to run tests, this would drive me nuts.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to