[ 
https://issues.apache.org/jira/browse/LUCENE-8550?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Nicholas Knize updated LUCENE-8550:
-----------------------------------
    Priority: Blocker  (was: Major)

> Tessellator fails when filtering coplanar points when creating linked list 
> ---------------------------------------------------------------------------
>
>                 Key: LUCENE-8550
>                 URL: https://issues.apache.org/jira/browse/LUCENE-8550
>             Project: Lucene - Core
>          Issue Type: Bug
>          Components: modules/sandbox
>            Reporter: Ignacio Vera
>            Priority: Blocker
>         Attachments: LUCENE-8550.patch
>
>
> Currently when creating the linked list on the tessellator, coplanar points 
> are filtered. The problem is the following: 
> if we have three coplanar points, the code is actually removing the last 
> point, instead it should remove the middle one.
>  
>  



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscr...@lucene.apache.org
For additional commands, e-mail: dev-h...@lucene.apache.org

Reply via email to