Hi all, We now have two tickets that look to me like they are worthy of inclusion in a point release:
CONNECTORS-1138 and CONNECTORS-1145 I've tentatively created Jira versions for 1.8.1 and 2.0.1, and I've updated the release-1.8-branch and release-2.0-branch for these potential releases. If we do them, I would propose that we aim for release at the end of January. Meanwhile, I'd propose we accumulate more tickets for another week or so. Does this sound like a reasonable plan? Karl
