Hey folks.
Looking over the white-site, I'm worried about the view build
schedule page. Since I almost always use continuum to run a continual
build cycle (usually implemented by a five-minute or ten-minute build
schedule). I can see this getting crowded. So I a wondering if only
the next build for a project be listed? Or perhaps the next build for
each build definition per project.
Other than that, I really like this view, especially the
fine-grained control over each upcoming build. I also very much like
the way profiles are organized. I think this one's a winner.
(Oh, I'd probably name the link "view scheduled builds" rather than the
"view build schedule", as it is slightly ambiguous with viewing a list
of build definitions as it is.)
Christian.
--
*christian** gruber + process coach and architect*
*Israfil Consulting Services Corporation*
*email** [EMAIL PROTECTED] + bus 905.640.1119 + mob 416.998.6023*