On 4/20/07, [EMAIL PROTECTED] <[EMAIL PROTECTED]> wrote:
I hope that I am not asking for more features as you are finalizing 1.1
3) When a build fails contiuum must trigger another build in X minutes (configurable), based on the 2nd build the notification should be send out. This will avoid errors due to partial check-ins
The problem was addressed in a slightly different way. Continuum 1.1 has a 'quiet period'. If there have been changes in the last X minutes (configurable), Continuum will skip that scheduled build, thinking you migh be in the middle of a check-in. -- Wendy
