[ 
https://issues.apache.org/jira/browse/ODE-1009?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Tammo van Lessen updated ODE-1009:
----------------------------------
    Fix Version/s:     (was: 1.3.7)

> Event handler must be installed AFTER an initial start activity has been 
> completed
> ----------------------------------------------------------------------------------
>
>                 Key: ODE-1009
>                 URL: https://issues.apache.org/jira/browse/ODE-1009
>             Project: ODE
>          Issue Type: Bug
>          Components: BPEL Runtime
>            Reporter: Tammo van Lessen
>             Fix For: 1.4
>
>
> See spec Sec. 12.1, p. 166: An initial start activity is the start activity 
> that caused a particular process instance to be instantiated. If a scope 
> contains an initial start activity then the start activity MUST complete 
> before the event handlers are installed.
> This makes sure that a correlation set can be initialized before an event 
> handler is installed that is using the same cset.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to