Pierre Smits created OFBIZ-5523:
-----------------------------------

             Summary: Be able to manually set preceding or succeeding 
production runs
                 Key: OFBIZ-5523
                 URL: https://issues.apache.org/jira/browse/OFBIZ-5523
             Project: OFBiz
          Issue Type: Improvement
          Components: manufacturing
    Affects Versions: SVN trunk
            Reporter: Pierre Smits
             Fix For: SVN trunk


In current feature set of the manufacturing compoment it is possible to set 
'create dependent production run(s). This function will create the dependent 
production runs and have these shown in the production run.

In other scenario's of managing production runs it is not possible to associate 
one production run to another in the component. Although it might be 
needed/required. In order to do nowthis the user must 
#have direct access to the workflow component (with appropriate permissions)
#look for the correct workeffort
#go to the children tab of the workeffort
#set the association

The improvement will be that the user of the manufacturing component will be 
able to define (in said component) the association between production runs.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)