[
https://issues.apache.org/jira/browse/OFBIZ-6085?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14481611#comment-14481611
]
Christian Carlow commented on OFBIZ-6085:
-----------------------------------------
So production run tasks may not be performed at different facilities? I don't
understand why such a rule is necessary. I created a parent facility
representing the plant containing child facilities representing the
departments. Tasks for a single routing are supposed to be performed in
various departments (subfacilities). Integration of the inventory
functionality is meant to provide managers the ability to determine where WIP
pieces are located amongst the various task facilties to get an idea of
department work loads and the progress of the part.
> Add support for production run inventory tracking
> -------------------------------------------------
>
> Key: OFBIZ-6085
> URL: https://issues.apache.org/jira/browse/OFBIZ-6085
> Project: OFBiz
> Issue Type: Improvement
> Components: manufacturing
> Affects Versions: Trunk
> Reporter: Christian Carlow
> Assignee: Pierre Smits
>
> Production run inventory tracking seems worthy of support so that production
> managers can get an idea of the department work load. InventoryItemDetails
> should be created during production run declarations so that the material
> that was stocked out for the production run can be tracked while it is being
> manufacturing into the good. Essentially is would be like stock moves or
> inventory xfers occuring within the production runs for the task fixed asset
> facilities/locations.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)