[
https://issues.apache.org/jira/browse/OFBIZ-7558?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Swapnil Shah updated OFBIZ-7558:
--------------------------------
Description:
Whenever quantity to produce is revised for any production run (in created
status) the material requirement at WEGS (per BoM) gets readjusted accordingly
but the same is not saved correctly (under WorkEffort.quantityToProduce)
Now when production run is confirmed, the quantity to produce is original
quantity but all material requirements at WEGS level are projected and
readjusted.
Expected Behavior:
Any changes made to Quantity to Produce for production run should be saved
correctly
Please refer to attached screenshot
!https://issues.apache.org/jira/secure/attachment/12811801/OFBIZ-7173.png|width=800px!
was:
Whenever quantity to produce is revised for any production run (in created
status) the material requirement at WEGS (per BoM) gets readjusted accordingly
but the same is not saved correctly (under WorkEffort.quantityToProduce)
Now when production run is confirmed, the quantity to produce is original
quantity but all material requirements at WEGS level are projected and
readjusted.
Expected Behavior:
Any changes made to Quantity to Produce for production run should be saved
correctly
Please refer to attached screenshot
> Any update made for 'Qty to produce' in a newly created production run not
> saved
> ---------------------------------------------------------------------------------
>
> Key: OFBIZ-7558
> URL: https://issues.apache.org/jira/browse/OFBIZ-7558
> Project: OFBiz
> Issue Type: Bug
> Components: manufacturing
> Affects Versions: Release Branch 14.12, Trunk, Release Branch 15.12
> Reporter: Swapnil Shah
> Assignee: Swapnil Shah
> Priority: Critical
>
> Whenever quantity to produce is revised for any production run (in created
> status) the material requirement at WEGS (per BoM) gets readjusted
> accordingly but the same is not saved correctly (under
> WorkEffort.quantityToProduce)
> Now when production run is confirmed, the quantity to produce is original
> quantity but all material requirements at WEGS level are projected and
> readjusted.
> Expected Behavior:
> Any changes made to Quantity to Produce for production run should be saved
> correctly
> Please refer to attached screenshot
> !https://issues.apache.org/jira/secure/attachment/12811801/OFBIZ-7173.png|width=800px!
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)