+1

On 09.10.13 17:16, "Amend, Christian" <[email protected]> wrote:

>Hi all,
>
>there is a possibility to link commits in our GIT repository with our
>Jira issues. This is described here:
>http://www.apache.org/dev/svngit2jira.html
>
>I would take all the steps necessary to enable this but I would like to
>ask first if this is something we should use.
>
>In my opinion we should do this not only to track which issues are
>associated with which commit but this can also be used as a way to build
>release notes on what changed and what bug fixes were implemented. This
>would save us a lot of manual labor to create release notes. So I will
>give a +1 from me.
>
>To give enough time to familiarize yourself with the topic I will leave
>this voting open till 16th October 2013.
>
>WDYT?
>
>Best Regards,
>Christian

Reply via email to