[
https://issues.apache.org/jira/browse/OOZIE-2063?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14208883#comment-14208883
]
Bowen Zhang commented on OOZIE-2063:
------------------------------------
committed to trunk and 4.1 branch. Thanks, Robert.
> Cron syntax creates duplicate actions
> -------------------------------------
>
> Key: OOZIE-2063
> URL: https://issues.apache.org/jira/browse/OOZIE-2063
> Project: Oozie
> Issue Type: Bug
> Components: coordinator
> Affects Versions: trunk, 4.0.0, 4.1.0, 4.0.1
> Reporter: Robert Kanter
> Assignee: Bowen Zhang
> Priority: Blocker
> Fix For: 4.1.0
>
> Attachments: cron.jpg, min.jpg, oozie-2063.patch, oozie-2063.patch
>
>
> If you use cron syntax, you'll get duplicate actions (i.e. actions with the
> same nominal time) at every throttle interval. For example, if throttle=12
> (the default), you'll have a duplicate action every 12 actions.
> Here's my coordinator:
> {code:xml}
> <coordinator-app name="cron-coord" frequency="*/5 * * * *" start="${start}"
> end="${end}" timezone="UTC"
> xmlns="uri:oozie:coordinator:0.2">
> <controls>
> <throttle>3</throttle>
> </controls>
> <action>
> <workflow>
> <app-path>${workflowAppUri}</app-path>
> <configuration>
> <property>
> <name>jobTracker</name>
> <value>${jobTracker}</value>
> </property>
> <property>
> <name>nameNode</name>
> <value>${nameNode}</value>
> </property>
> <property>
> <name>queueName</name>
> <value>${queueName}</value>
> </property>
> </configuration>
> </workflow>
> </action>
> </coordinator-app>
> {code}
> It runs every 5 min on the hour. I also ran a similar coordinator, but with
> the frequency set to {{coord:minutes(5)}}. I set the throttle to 3 so it
> would be easier to see the problem.
> Here are the two screenshots (make sure to either open them directly or widen
> the page to see the nominal time column):
> !cron.jpg!
> !min.jpg!
> As you can see in the cron screenshot, every 3 actions there's a duplicate
> action. And the next materialization time is the same as the latest
> materialized action, so it's going to do it again when it materializes more
> actions. On the minute screenshot, it's behaving correctly. You'll also see
> that the next materialized action is now 15 minutes ahead of the cron version!
> This has two major problems:
> - You have duplicate actions
> - The coordinator slowly gets further and further behind where it should be
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)