Peter Cseh created OOZIE-2794:
---------------------------------

             Summary: Hive and Pig tests failing when multiple pre-commit jobs 
are running
                 Key: OOZIE-2794
                 URL: https://issues.apache.org/jira/browse/OOZIE-2794
             Project: Oozie
          Issue Type: Bug
            Reporter: Peter Cseh


There are multiple cases when the following tests are failing together:
{noformat}
. testMain(org.apache.oozie.action.hadoop.TestHiveMain)
. testPigScript(org.apache.oozie.action.hadoop.TestPigMain)
. testEmbeddedPigWithinPython(org.apache.oozie.action.hadoop.TestPigMain)
. testPig_withNullExternalID(org.apache.oozie.action.hadoop.TestPigMain)
. testPigScript(org.apache.oozie.action.hadoop.TestPigMainWithOldAPI)
. testLoadDump(org.apache.oozie.tools.TestDBLoadDump)
{noformat}

This issue seems to occur when multiple pre-commit jobs are running. 




--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to