[
https://issues.apache.org/jira/browse/OOZIE-2881?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Anoop S Nair updated OOZIE-2881:
--------------------------------
Summary: We should be having a feature to rerun a Oozie job from a
successful step (was: We shoul be having a feature to rerun a Oozie job from a
successful step)
> We should be having a feature to rerun a Oozie job from a successful step
> -------------------------------------------------------------------------
>
> Key: OOZIE-2881
> URL: https://issues.apache.org/jira/browse/OOZIE-2881
> Project: Oozie
> Issue Type: New Feature
> Components: core
> Reporter: Anoop S Nair
> Priority: Minor
>
> we currently have two methods to rerun a Oozie workflow job
> one using failed node and another using skip nodes , but the real issue
> arises when we are unable to run a job with skip node once we have used
> failed node in past execution.
> It becomes very hectic when we trigger a workflow with huge count of steps.It
> would we very helpful if we can have a method to re trigger a job from a
> successful node .
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)