[ 
https://issues.apache.org/jira/browse/OPENJPA-1943?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Albert Lee updated OPENJPA-1943:
--------------------------------

    Attachment: OPENJPA-1943.patch

> Query timeout hint not honored consistently when pessimistic lock is issued 
> to database requires multi-statements locking scheme
> --------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: OPENJPA-1943
>                 URL: https://issues.apache.org/jira/browse/OPENJPA-1943
>             Project: OpenJPA
>          Issue Type: Bug
>          Components: jpa, kernel
>    Affects Versions: 2.0.1, 2.1.0, 2.2.0
>            Reporter: Albert Lee
>            Assignee: Albert Lee
>             Fix For: 2.1.1, 2.2.0
>
>         Attachments: OPENJPA-1943.patch
>
>
> Query timeout and lock timeout values are stored in fetch plan/configuration. 
> Due to semantic difference between the Query and em API, separate fetch 
> plan/configuration objects are attached to QueryImpl and EntityManagerImpl. 
> When pessimistic lock is enforced by the provider to a query, if the 
> underlying data base requires to generate multiple SQL statements, the 
> timeout value from the QueryImpl is used to execute the data portion of the 
> SQL statements but the timeout value from the EntityManagerImpl is used to 
> issue the "FOR UPDATE" lock to the related table. This caused the discrepancy 
> that the query timeout is NOT being honored. As a result, some database may 
> wait forever and caused a "hung" scenario even the query timeout value is 
> set. 
>     

-- 
This message is automatically generated by JIRA.
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to