Hi!
Frederik Ramm wrote: > > I had that once and found it was a problem where somehow the master > could not message back to tirex-batch that it had completed a tile. I > thought I had fixed the problem in r23241. > > I believe it mostly happened in a scenario where you would input one > batch of tiles with tirex-batch, then when that has terminated and > before the queue is processed you start a second batch. Maybe, but I'm > unsure with that, the problem occurs if the second batch contains a > tiles that was already in the first or so. > I am using r24508, so that change should be included. It is well possible it is the same problem, there are multiple calls to tirex-batch in a script file. Do you think putting a small sleep between them might work around the problem? bye Nop -- View this message in context: http://gis.638310.n2.nabble.com/Tirex-freezes-when-adding-many-tiles-with-tirex-batch-tp5970695p5971201.html Sent from the Developer Discussion mailing list archive at Nabble.com. _______________________________________________ dev mailing list dev@openstreetmap.org http://lists.openstreetmap.org/listinfo/dev