On Mon, Jul 18, 2016 at 04:21:17PM -0500, Ryan Moats wrote:
> This code changes to allow incremental processing of the
> logical flow and physical binding tables whenver possible.
>
> Note: flows created by physical_run for multicast_groups are
> *NOT* handled incrementally due to to be solved issues
> with GWs and local routers.
>
> Signed-off-by: Ryan Moats <[email protected]>
With this applied, I get a number of apparently consistent test failures
(literally no passes in 5+ runs) that I don't see, at least not
consistently, if I revert it:
OVN end-to-end tests
2106: ovn -- vtep: 3 HVs, 1 VIFs/HV, 1 GW, 1 LS FAILED (ovn.at:1307)
2107: ovn -- 3 HVs, 1 VIFs/HV, 1 software GW, 1 LS FAILED (ovn.at:1473)
2108: ovn -- 3 HVs, 3 LS, 3 lports/LS, 1 LR FAILED (ovn.at:1887)
2110: ovn -- 2 HVs, 2 LS, 1 lport/LS, 2 peer LRs FAILED (ovn.at:2416)
2115: ovn -- 2 HVs, 3 LRs connected via LS, static routes FAILED
(ovn.at:3053)
Do these pass reasonably often for you? (Maybe my changes to the
previous patch screwed something up?)
_______________________________________________
dev mailing list
[email protected]
http://openvswitch.org/mailman/listinfo/dev