Hi all, In order to keep you on the same page, I will discuss my release plan for openwhisk 0.9.0 of all the 13 modules.
As you know, we have already released OpenWhisk main module for Version 0.9.0 in Apache for the first time. There are still 12 other modules/projects on the roadmap. I would like to release the rest of them in groups: * client go and cli as a group, * catalog and apigateway as a group, * wskdeploy and deploy cube as a group, * Nodejs, Java and Swift runtimes as a group, * Docker, Php and Python as a group, till all the modules are released under 0.9.0, which means I will send out emails for votes based on different groups. Please prepare for them. I expect another month to release all the rest modules, on top of main module. I will tag all of them as Version 0.9.0-incubating to be consistent with the main module, so far in the end we will have all the 13 modules under the same version number for users to pick, build and install. I also offer a full-set artifact named openwhisk-0.9.0-incubating-all.tar.gz including all the 13 modules for one-stop download, after all the 13 modules are released. The reason why we would not release all the modules at a time was discussed here:https://www.mail-archive.com/[email protected]/msg01893.html. This release plan I proposed above is a compromise of release all at a time and release one-by-one. I would like to hear the comments from about this release plan. If no objection is received, we will go with it. Thank you. Best wishes. Vincent Hou (侯胜博) Advisory Software Engineer, OpenWhisk Contributor, Open Technology, IBM Cloud Notes ID: Vincent S Hou/Raleigh/IBM, E-mail: [email protected], Phone: +1(919)254-7182 Address: 4205 S Miami Blvd (Cornwallis Drive), Durham, NC 27703, United States
