*Highlights
*Chandler 0.6 milestone achieved: 0.5.03, containing new mail and sharing work, repository performance improvements and many Apps area cleanups.
- required one re-build and a few bug fixes
- work already underway toward 0.5.04 in approx. one month
*New people*: Arel Cordero, apps team intern and Jared Rhine, IT (part-time for now)

*Design Team (*http://wiki.osafoundation.org/bin/view/Chandler/DesignGroup)* Progress: *Detail view and calendar spec were sent to dev list for final review. *Plans: * Review shortly for ContextMenu spec, meet to discuss sharing spec, update trash and deletion spec
*
Applications (*http://wiki.osafoundation.org/bin/view/Chandler/ApplicationProject)*
Progress*: Nailed 0.5.03.   Trash and Deletion spec reviewed.
*Plans: *Detailed plan for 0.5.04 previously drafted but now will review work and load balance and make progress on drafts. *Personnel*: Alec on paternity leave. Arel Cordero, intern, started this week.
*Problems: *Dire need for linux box access for testing.
*
Services (*http://wiki.osafoundation.org/bin/view/Chandler/ServicesWorkingGroup)* Progress: *Zanshin integration work checked in and bugs ironed out for milestone. Email code review completed. I18n architecture planning ongoing -- draft circulated in small group. Filtered shares work almost complete as per 0.5.03 goal. *Plans: *Recurrence spec revision imminent (Jeffrey). I18n plan revision and broader audience (Brian). Finish filtered shares work and review (Morgen). Finish adding dynamic certs (Heikki)
*
Developer Platform and Repository (*http://wiki.osafoundation.org/bin/view/Chandler/DeveloperPlatformProject)* Progress*: Schema API work progress and testing by Katie and Ted. Datetime and sharing fixes done for 0.5.03. Test framework related work (Phillip). *Plans:* Revise ItemCollection spec and implementation plan (Ted). Testability and test framework improvements (Phillip). Input to revisions of recurrence, i18n specs (Katie)
*Personnel: *Andi on holiday this week.

*Server (Cosmo and Scooby)
Progress: *Cosmo build 0.2-1 available -- the first build with work towards 0.2 goals.
*Plans: *Add ticket support.  Work on Scooby planning with Mitch.
*
QA (*http://wiki.osafoundation.org/bin/view/Journal/AparnaKadakia20060607)*
Progress: *Testing a 1000-event calendar with new test data reflecting real-life usage. Some performance comparison tests beginning. Milestone build tested and filed bugs. Regression bugs are now marked with keyword 'regression'. Demo test contributions. *Plans: *More silk tests being written. Continuing work on setting up machine to do 2-chandler instance demos.
*
Build (*http://wiki.osafoundation.org/bin/view/Chandler/BuildProject)*
Progress: *Subversion move completed.* *Put silk test results on Tinderbox build pages. Built and released 0.5.03. *Plans: *Hardhat-related build housekeeping. Implement run_test in build system.
*
**IT: *
*Progress: *Dealt with email system move and fallout. *Plans: *Put together team project and task list and start prioritizing or at least identify top five issues -- most likely to include Linux box access for test by Apps team and permalinks for OSAF-hosted blogs.
*Personnel: *Jared Rhine started part-time (fulltime after Aug)
*
Community/Communications/Conferences:
Progress:* CalConnect last week -- Lisa participated in roundtable; new draft of CalDAV published. *Plans: *Follow up on CSG meetings from a couple weeks back to see how university needs are evolving