Ok, as of r9008, this work is done. The calendar should hopefully be about 1% faster for basic drawing calculations, and is now far more flexible about columns and column placement. In addition, the "Week" column is now a fixed width rather than proportional to the other columns. Its ok to start filing bugs against calendar display again :)

Alec

Alec Flett wrote:
In an effort to better support i18n efforts, as well as further optimize the calendar display for different widths of screens and such, I'm going to be tweaking the plumbing on some of the geometry calculations in the calendar.

This, unfortunately, is a pretty nasty affair since there are a lot of assumptions in the calendar that the first 8 columns are all more or less the same identical width...

I'm going to do this in stages, so that I can use subversion to help me in case I dig myself into a hole during one of the stages. But this means for the next week or so, you're going to see lines and events lozenges and columns that get misaligned by anywhere from 1 to 7 pixels, depending on how wide your window is. Please bear with me and don't file any bugs against slight misalignments in the calendar until I send out another e-mail. Thanks!

Alec

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Open Source Applications Foundation "Dev" mailing list http://lists.osafoundation.org/mailman/listinfo/dev



_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Open Source Applications Foundation "Dev" mailing list
http://lists.osafoundation.org/mailman/listinfo/dev

Reply via email to