Am 21.03.2017 um 17:53 schrieb Andreas Lehmkuehler:
Hi,
I'm thinking about implementing some stuff which would most likely
require a new major version. Obviously there are some similar things
which already came up, e.g. remove some disturbing public constants,
switch to java 7 to use twelve monkeys lib.
The question is, how should we deal with that. I see a handful of
possible ways:
- switch the current trunk to 3.0 and omit 2.1 (for now there are 3
tickets with "Fix version/s" 2.1 which didn't make it to the 2.0
branch for different reasons)
- create a 2.1 branch based on the current trunk and switch the
current trunk to 3.0
- create a 3.0 branch and don't change anything else. Merge all
changes to the trunk once 2.1 was released some time in the future
- don't change anything officially, but create a "private" 3.0 branch
and merge those changes to a future 3.0 version
I'm for solution 1 because it's a PITA to care about many versions.
Tilman
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]