[
https://issues.apache.org/jira/browse/PHOENIX-1571?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14262778#comment-14262778
]
Hudson commented on PHOENIX-1571:
---------------------------------
SUCCESS: Integrated in Phoenix-master #537 (See
[https://builds.apache.org/job/Phoenix-master/537/])
PHOENIX-1571 Replace hard-coded date (gabrielr: rev
2c58b1fc9b25c5cd5da872782b37bbdccf259c79)
* phoenix-core/src/it/java/org/apache/phoenix/end2end/VariableLengthPKIT.java
> Update hard-coded date in integration test
> ------------------------------------------
>
> Key: PHOENIX-1571
> URL: https://issues.apache.org/jira/browse/PHOENIX-1571
> Project: Phoenix
> Issue Type: Bug
> Reporter: Gabriel Reid
> Assignee: Gabriel Reid
> Attachments: PHOENIX-1571.patch
>
>
> The first jenkins build of the year uncovered the fact that there was an
> integration test ({{VariableLengthPKIT#testSkipScan}}) that uses an
> unrealistically distant hard-coded future date (2015-01-01) which has now
> been reached.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)