[ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
----------------------------------
    Attachment: PHOENIX-3181_v4.patch

Thanks, [~rajeshbabu]. Here's the patch you need to apply to master - I've set 
a couple of tests in LocalIndexIT to ignore - I can just move these out to a 
separate class derived from BaseHBaseManagedTimeIT if need be, so it's not 
critical. You just need to run mvn verify a few times after removing the ignore 
tags. At least on my Mac, it pretty consistently hangs.

If you can figure out PHOENIX-3281, you win a prize :-). That's the real 
blocker. Seems like the JVMs aren't exiting as they should.

> Run test methods in parallel to reduce test suite run time
> ----------------------------------------------------------
>
>                 Key: PHOENIX-3181
>                 URL: https://issues.apache.org/jira/browse/PHOENIX-3181
>             Project: Phoenix
>          Issue Type: Bug
>            Reporter: James Taylor
>            Assignee: prakul agarwal
>         Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, parallelize_4.x-Hbase1.1_wip.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to