Lars Hofhansl created PHOENIX-5381:
--------------------------------------
Summary: Increase phoenix.task.handling.interval.ms to 10s for
tests
Key: PHOENIX-5381
URL: https://issues.apache.org/jira/browse/PHOENIX-5381
Project: Phoenix
Issue Type: Bug
Reporter: Lars Hofhansl
BaseTests sets this 1000ms, and I see the logs filled the scans for new tasks.
That produces more IO on the jenkins VMs and require archiving much more data.
There are only a few tests that do anything with tasks and those would slow
down on average by 4.5 seconds.
The production default is 1 minute, setting this to 10s for tests seems more
sensible.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)