[
https://issues.apache.org/jira/browse/PHOENIX-5962?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Istvan Toth reassigned PHOENIX-5962:
------------------------------------
Assignee: Richard Antal
> Stabilize builds
> ----------------
>
> Key: PHOENIX-5962
> URL: https://issues.apache.org/jira/browse/PHOENIX-5962
> Project: Phoenix
> Issue Type: Task
> Reporter: Richard Antal
> Assignee: Richard Antal
> Priority: Major
> Attachments: PHOENIX-5962.master.v1.patch,
> PHOENIX-5962.master.v2.patch
>
>
> Last 2 build was aborted becauseĀ Build timed out (after 360 minutes).
> Search the possible cause of the problem and try to fix it.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)