A related topic I'd like to bring up is test stabilization and community review bandwidth. I am doing a sweep of unit tests and IT tests and am hitting issues that I have filed fix PRs for one, two, or more months ago. These PRs have been waiting for review since that time.
Historically our review-then-commit conventions preclude me from merging my own PRs, but given the lack of community review bandwidth, I am going to start merging my own PRs ** specifically test fixes only, unblocking the test suite ** as long as Copilot gives me the green light to merge. The test fix PRs will be minimally scoped. If there is anything more than a minor risk change the PR is likely to simply @Ignore the test. In other words, in lieu of community particiation in review, which is currently lacking for whatever reason, I am going to bring in Copilot as contributor and review buddy for Test and IT test fixes. Please let me know if you object to this. However, if you do plan to object, I would like to think you are also volunteering your time to review all of my test fix PRs until they have landed. If I have no response I am assuming a green light under lazy consensus. - Andrew On Fri, Oct 9, 2026 at 1:48 PM Andrew Purtell <[email protected]> wrote: > > Hi all, > > I propose that we start work toward Phoenix 5.4.0. As such, I > volunteer myself as your RM for the 5.4.0 release and will start > the tasks required to complete it. > > Please give your feedback on the plan, and on the questions toward > the end of this mail. > > SCOPE > > 5.4.0 contains everything that has landed on master so far > and including these additional in-flight features: > > - EXPLAIN improvements (PHOENIX-7876) -- committed to master > - V2 WHERE optimizer (PHOENIX-6791) -- PR #2428 is approved. > - Consistent Failover (PHOENIX-7562) -- in development on the > PHOENIX-7562-feature-new branch. > - Vector indexes, Phase 1 and Phase 2 (PHOENIX-7998 and > PHOENIX-8009, umbrella PHOENIX-8008) -- Both are in review. > > Master also has TRUNCATE TABLE (PHOENIX-300), and numerous other > changes that are not on 5.3, committed over the intervening time. > > The V2 WHERE optimizer is off by default in 5.4.0. Users will enable > it per their discretion with phoenix.where.optimizer.v2.enabled=true. > Consistent Failover and Vector Indexes are also opt-in features that > do not have an impact unless configured and enabled. > > We will cut the 5.4 branch only after all of the features above are > merged to master. For this reason, the date of the cut depends on the > readiness of the features, with the possible exception of Consistent > Failover, which has 21 open subtasks. Stabilization of 5.4 branch can > begin with most everything else in place and Consistent Failover can > come in at any point as a backport of the merge commit to master > branch. > > MINIMUM JAVA VERSION POLICY > > 5.4.0 as proposed changes the minimum supported Java version policy: > > - Minimum: Java 11. 5.4.0 will not build or run on Java 8. > - Recommended: Java 17. > - Suggested for vector indexes: Java 21. > > Phoenix ships multi-release jars. On Java 21, the JVM loads vector > kernels that use the Panama Vector API. On Java 11 and 17, it loads > portable kernels. > > Although this is a significant change for users, it is unlikely users > remain on Java 8 for a myriad of technical and compliance related > reasons. The release notes will state the policy clearly. Users who > must stay on Java 8 can continue with the 5.3 release line. > > PLAN > > Phase 1. Land the features on master. PHOENIX-6791 merges first. > PHOENIX-7998 and PHOENIX-8009 merge in sequence. PHOENIX-8009 > also moves the build and CI to Java 11. Consistent Failover > merges last. > > Phase 2. Cut the 5.4 branch. Master moves to 5.5.0-SNAPSHOT. We > triage the unresolved 5.4.0 issues in JIRA, and keep only the > release blockers. > > Phase 3. Stabilize. The work includes these items: > - Fix or quarantine flaky tests. > - Harden each new feature. > - Test compatibility and upgrade from 5.2 and 5.3. > - Build and test each HBase profile on JDK 11, 17, and 21. > - Review licenses for the new dependencies. > - Update the release tooling to JDK 17. > - Check the downstream projects. > - Write the release notes and documentation. > > Phase 4. Release candidates and vote. > > The Critical issues PHOENIX-7279 and PHOENIX-7596 currently block > releasing. > > The work of stabilizing the tests is expected to be the bulk of the > required time and effort. > > On the 5.4 branch, bug fixes, test fixes, and documentation can go in > after review. New features and behavior changes need the consent of > the release manager. > > PHASE 3 WORKSTREAMS > > 1. Test health > > - Fix flaky tests, or quarantine them with a JIRA. > - Get the nightly results clean. > > 2. Feature hardening > > - V2 WHERE optimizer: Add a CI run of the full integration test > suite with the V2 WHERE optimizer enabled. > - Consistent Failover: Run the cross-cluster integration tests. > Test a rolling upgrade while clients that use the ZooKeeper- > based HA connection continue to have service. Finish the HA client > documentation. > - Vector indexes: Make sure that each shaded jar preserves the multi- > release manifest. > > 3. Compatibility and upgrade > > - Use the backward compatibility test framework (PHOENIX-7702). > Test 5.3 clients against 5.4 servers, and 5.4 clients against 5.3 > servers. > - Test the upgrade of the SYSTEM tables from 5.3. > - Test a rolling upgrade of the region servers from 5.3 to 5.4. > > 4. Supported JDK matrix > > - Build and test each HBase profile (2.5.0, 2.5, 2.6.0, 2.6) on JDKs > 11, 17, and 21. > - Record the supported combinations in the release notes. > > 5. Dependencies and legal requirements > > - Review LICENSE and NOTICE for the new dependencies and their > transitive dependencies. > - Do a CVE scan of the binary artifacts. > - Ensure Apache RAT audits are successful. > > 6. Release tooling > > - The release image `dev/create-release/phoenix-rm/Dockerfile` uses > JDK 8. Move it to JDK 11 at least, although JDK 17 is recommended. > - Do a dry run of the release scripts before RC0. > > 7. Downstream projects > > - Build `phoenix-queryserver` and `phoenix-connectors` against > `5.4.0-SNAPSHOT` with Java 11 or later and document any changes > required. Note that the 5.4.0 core release is not blocked by these > downstreamers, who can continue with 5.3. > > 8. Documentation > > - The release notes will include these items: > - The new minimum Java version policy. > - The EXPLAIN format changes. > - The new features, their flags or configuration options, and > defaults. > - The supported HBase versions and JDKs. > - Update the website documentation for vector indexes, Consistent > Failover, and EXPLAIN improvements. > > The exit criteria for Phase 3 are as follows: > > - No release blockers are open. > - The nightly builds pass on the full platform matrix. > - The compatibility and upgrade tests pass. > - The release notes and documentation are complete. > - The release tooling dry run passes. > > QUESTIONS > > Do we agree on the scope? > > Do we accept the minimum Java version policy for the 5.4 code line: > Java 11 minimum, Java 17 recommended, Java 21 suggested for vector > indexes? > > Are there other current blockers in addition to PHOENIX-7279 and > PHOENIX-7596? > > -- > Best regards, > Andrew -- Best regards, Andrew Robber barons, ketamine cowboys Vulture capital parasites Unearned vanity, silicon sadists Sharks with gluttonous appetites Arrogant halfwits, nepotist failures Trust fund vagrants, indigent kings Culture warriors, gaslight grifters Charlatans with silver tongues - A23, Lunatics
