[ 
https://issues.apache.org/jira/browse/PIG-2831?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13447471#comment-13447471
 ] 

Prasanth J commented on PIG-2831:
---------------------------------

One more thing I forgot to mention. Since we have implemented statistics 
gathering which is a runtime operation, we cannot fallback to naive cubing if 
we detect a small dataset. Earlier we estimated the total number of rows during 
the compile time and based on our estimation we chose whether to use mrcube 
approach or naive approach. We need to provide a way for the user to disable 
mrcube approach for smaller dataset as naive cubing on small dataset is much 
faster than mrcube. mrcube takes 4 MRJobs whereas naive cubing can be done in a 
single job. Should we provide pig property for enabling/disabling mrcube 
approach?
                
> MR-Cube implementation (Distributed cubing for holistic measures)
> -----------------------------------------------------------------
>
>                 Key: PIG-2831
>                 URL: https://issues.apache.org/jira/browse/PIG-2831
>             Project: Pig
>          Issue Type: Sub-task
>            Reporter: Prasanth J
>            Assignee: Prasanth J
>         Attachments: PIG-2831.1.git.patch, PIG-2831.2.git.patch, 
> PIG-2831.3.git.patch, PIG-2831.4.git.patch, PIG-2831.5.git.patch
>
>
> Implementing distributed cube materialization on holistic measure based on 
> MR-Cube approach as described in http://arnab.org/files/mrcube.pdf. 
> Primary steps involved:
> 1) Identify if the measure is holistic or not
> 2) Determine algebraic attribute (can be detected automatically for few 
> cases, if automatic detection fails user should hint the algebraic attribute)
> 3) Modify MRPlan to insert a sampling job which executes naive cube algorithm 
> and generates annotated cube lattice (contains large group partitioning 
> information)
> 4) Modify plan to distribute annotated cube lattice to all mappers using 
> distributed cache
> 5) Execute actual cube materialization on full dataset
> 6) Modify MRPlan to insert a post process job for combining the results of 
> actual cube materialization job
> 7) OOM exception handling

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to