Rohini Palaniswamy created PIG-4785:
---------------------------------------

             Summary: Optimize multi-query plan for diamond shape edges
                 Key: PIG-4785
                 URL: https://issues.apache.org/jira/browse/PIG-4785
             Project: Pig
          Issue Type: Sub-task
            Reporter: Rohini Palaniswamy
            Assignee: Rohini Palaniswamy


  If diamond shaped edge (two edges going to same vertex), we do not merge into 
Split. Lot of data is transferred because of that. It can be optimized to merge 
the operator into the Split, but still have a POValueInputTez->POValueOutputTez 
vertex which just will be used to redirect the input to avoid the diamond 
shaped edge.  This will allow filtering and other processing to happen in the 
Split operator itself and the data transferred to the routing vertex will be 
minimal.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to