[
https://issues.apache.org/jira/browse/DISPATCH-2226?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Ganesh Murthy resolved DISPATCH-2226.
-------------------------------------
Assignee: Ganesh Murthy
Resolution: Fixed
> Fix system_tests_topology_disposition.test_02_topology_disposition (flakey)
> ---------------------------------------------------------------------------
>
> Key: DISPATCH-2226
> URL: https://issues.apache.org/jira/browse/DISPATCH-2226
> Project: Qpid Dispatch
> Issue Type: Test
> Components: Tests
> Affects Versions: 1.16.1
> Reporter: Ken Giusti
> Assignee: Ganesh Murthy
> Priority: Major
> Fix For: 1.18.0
>
>
> This test times out. IIUC it needs to wait until all the router-side sending
> links have capacity before starting the test. If possible it should be
> simplified.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]