[
https://issues.apache.org/jira/browse/DISPATCH-1540?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Ganesh Murthy reassigned DISPATCH-1540:
---------------------------------------
Assignee: Ganesh Murthy
> multiframe presettled messages not included in presettled count on downstream
> router
> -------------------------------------------------------------------------------------
>
> Key: DISPATCH-1540
> URL: https://issues.apache.org/jira/browse/DISPATCH-1540
> Project: Qpid Dispatch
> Issue Type: Bug
> Reporter: Gordon Sim
> Assignee: Ganesh Murthy
> Priority: Major
>
> Set up two routers connected to each other. Attach receiver to one, sender to
> the other and send a large message (such that it is sent as multiple transfer
> frames).
>
> Then look at the inter-router link stats for each router. The downstream
> router (i.e. that to which receiver is attached), does not record the
> delivery as presettled.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]