[ 
https://issues.apache.org/jira/browse/DISPATCH-1540?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ganesh Murthy reassigned DISPATCH-1540:
---------------------------------------

    Assignee: Ganesh Murthy

> multiframe presettled messages not included in presettled count on downstream 
> router 
> -------------------------------------------------------------------------------------
>
>                 Key: DISPATCH-1540
>                 URL: https://issues.apache.org/jira/browse/DISPATCH-1540
>             Project: Qpid Dispatch
>          Issue Type: Bug
>            Reporter: Gordon Sim
>            Assignee: Ganesh Murthy
>            Priority: Major
>
> Set up two routers connected to each other. Attach receiver to one, sender to 
> the other and send a large message (such that it is sent as multiple transfer 
> frames).
>  
> Then look at the inter-router link stats for each router. The downstream 
> router (i.e. that to which receiver is attached), does not record the 
> delivery as presettled.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to