Great! I will test against my site and the blogs.apache.org database today
and hope to update rollerweblogger.org to be running 5.1 sometime tomorrow.

- Dave



On Fri, Aug 15, 2014 at 10:39 PM, Glen Mazza <glen.ma...@gmail.com> wrote:

> OK, I'm happy to report the first two items are done, also, Dual DB/Open
> ID security seems to run pretty well so we'll have 4 auth options
> (everything except CMA) available.  I just want to sanity check trackbacks
> tomorrow and then I'll be finished on my side for 5.1.
>
> Glen
>
>
> On 08/13/2014 09:28 PM, Glen Mazza wrote:
>
>> Hi team, things I see left for 5.1 (at least on my side):
>>
>> -- Creating a blog post from the MediaFileFromEdit view is inoperative
>> perhaps as a result of recent changes I made, I need to revisit it.
>>
>> -- Need to make sure the User Admin and Edit Profile are showing the
>> correct fields depending on the security implementation (LDAP, OpenID, or
>> regular Database)--some have password fields, some don't etc.  (We may not
>> have Dual DB/Open ID ready for 5.1, I don't want to hold off a release for
>> that though.)  This is about halfway done.
>>
>> -- Check that trackbacks work.  I've never used them before and would
>> like to make sure they basically work.
>>
>> There are many other tasks that can be done, but those can wait for 5.1.1
>> and onward.  So long as 5.1 is more solid than 5.0.4, we should be OK for a
>> release.
>>
>> Regards,
>> Glen
>>
>>
>

Reply via email to