Great! I will test against my site and the blogs.apache.org database today and hope to update rollerweblogger.org to be running 5.1 sometime tomorrow.
- Dave On Fri, Aug 15, 2014 at 10:39 PM, Glen Mazza <glen.ma...@gmail.com> wrote: > OK, I'm happy to report the first two items are done, also, Dual DB/Open > ID security seems to run pretty well so we'll have 4 auth options > (everything except CMA) available. I just want to sanity check trackbacks > tomorrow and then I'll be finished on my side for 5.1. > > Glen > > > On 08/13/2014 09:28 PM, Glen Mazza wrote: > >> Hi team, things I see left for 5.1 (at least on my side): >> >> -- Creating a blog post from the MediaFileFromEdit view is inoperative >> perhaps as a result of recent changes I made, I need to revisit it. >> >> -- Need to make sure the User Admin and Edit Profile are showing the >> correct fields depending on the security implementation (LDAP, OpenID, or >> regular Database)--some have password fields, some don't etc. (We may not >> have Dual DB/Open ID ready for 5.1, I don't want to hold off a release for >> that though.) This is about halfway done. >> >> -- Check that trackbacks work. I've never used them before and would >> like to make sure they basically work. >> >> There are many other tasks that can be done, but those can wait for 5.1.1 >> and onward. So long as 5.1 is more solid than 5.0.4, we should be OK for a >> release. >> >> Regards, >> Glen >> >> >